This bearing housing was installed on the piers of a 7’-6” diameter two pier Cooler that was used to produce lime. It was taken out of service after about 15 years of use. This Bearing Housing was professionally dismantled and RECONDITIONED* in the spring of 2012.
This tire was installed on the discharge end of an 11’-6” diameter three pier Rotary Kiln that was used to produce lime. It was taken out of service after about 15 years of use. The tire was professionally removed from the shell in the fall of 2011 and is immediately available.
This thrust idler was installed on the thrust pier of a 7’-6” diameter two pier Cooler that was used to produce lime. It was taken out of service after about 15 years of use. This Thrust Idler was professionally dismantled in the Fall of 2011 and has been cleaned, serviced and painted.
This trunnion was installed on a 7’-6” diameter two pier Cooler that was used to produce lime. It was taken out of service after about 15 years of use. The trunnion was professionally dismantled in the fall of 2011 and is immediately available.
This burner and combustion chamber was operated with an 8’ diameter dryer that produced pelletized lime fertilizer. It was taken out of service in 2011.
This Drive Base was operated with a dryer that was manufactured in 2001 and used to produce fertilizer. It was taken out of service in 2011. This drive base is immediately available.
This sprocket was installed on a dryer that was manufactured in 2001 and used to produce fertilizer. It was taken out of service in 2011. The sprocket was professionally removed from the shell and is immediately available.
This tire was installed on a dryer that was manufactured in 2001 and used to produce fertilizer. It was taken out of service in 2011. This tire was professionally removed from the shell and is immediately available.
This trunnion base was operated with a dryer that was manufactured in 2001 and used to produce fertilizer. It was taken out of service in 2011. It has a matching trunnion base without thrust idler, IKD-6011WS. This trunnion base is immediately available.
This trunnion base was operated in conjunction with a 9’ diameter dryer that was manufactured in the late 1950’s and has been upgraded on several occasions. This trunnion base is immediately available.
This bearing housing was installed on the discharge end of an 11’-6” diameter three pier Kiln that was used to produce lime. It was taken out of service after about 15 years of use. This Bearing Housing was professionally dismantled and reconditioned in the spring of 2012.
This bearing housing was installed on the feed and thrust piers of an 11’-6” diameter three pier Kiln that was used to produce lime. It was taken out of service after about 15 years of use. This Bearing Housing was professionally dismantled and reconditioned in the spring of 2012.
This bearing housing was installed on the piers of a 7’-6” diameter two pier Kiln that was used to produce lime. It was taken out of service after about 15 years of use. This Bearing Housing was professionally dismantled and reconditioned in the spring of 2012.
This Pinion Gear assembly has NEVER BEEN USED! It was purchased by the previous Owner as a spare and was never installed. The kiln it was designed for was a three (3) pier, 11’-6” nominal O.D. x 275’ long, that was manufactured by Allis Chalmers in the mid 1960’s.
This thrust idler was installed on the thrust pier of an 11’-6” diameter three pier Rotary Kiln that was used to produce lime. It was taken out of service after about 15 years of use. This Thrust Idler was professionally dismantled and RECONDITIONED* in the spring of 2012.
This thrust idler was installed on the thrust pier of a 7’-6” diameter two pier Rotary Kiln that was used to produce lime. It was taken out of service after about 15 years of use. This Thrust Idler was professionally dismantled in the Fall of 2011 and has been cleaned, serviced and painted.
This tire was installed on the feed end pier of an 11’-6” diameter three pier Rotary Kiln that was used to produce lime. It was taken out of service after about 15 years of use. This tire was professionally removed from the shell in the fall of 2011 and is immediately available.
This tire was installed on the thrust pier of an 11’-6” diameter three pier Rotary Kiln that was used to produce lime. It was taken out of service after about 15 years of use. This tire was professionally removed from the shell in the fall of 2011 and is immediately available.
This tire was installed on a two pier Rotary Kiln that was used to produce lime. It was taken out of service after about 15 years of use. This tire was professionally removed from the shell in the fall of 2011 and is immediately available.
This tire was installed on the thrust pier of a two pier Rotary Kiln that was used to produce lime. It was taken out of service after about 15 years of use. This tire was professionally removed from the shell in the fall of 2011 and is immediately available.
This trunnion was installed on the discharge end of an 11’-6” diameter three pier Rotary Kiln that was used to produce lime. It was taken out of service after about 15 years of use. The trunnion was professionally dismantled in the fall of 2011 and is immediately available.
This trunnion was installed on an 11’-6” diameter three pier Rotary Kiln that was used to produce lime. It was taken out of service after about 15 years of use. The trunnion was professionally dismantled in the fall of 2011 and is immediately available.
This trunnion was installed on a 7’-6” diameter two pier Rotary Kiln that was used to produce lime. It was taken out of service after about 15 years of use. The trunnion was professionally dismantled in the fall of 2011 and is immediately available.